Where a Sportswear Manufacturer Says No to Over-Spec: A Cost Breakdown
A good supplier is not the one who agrees to every line in your spec. It is the one who tells you which lines actually change the cost — and which ones just add cost without adding quality. Here is an honest breakdown from an OEM sportswear factory of where testing money goes, where brands over-spec, and where we will push back before a bulk order.

1 · The Over-Spec Trap in Activewear Sourcing
Roughly 90% of quality cost is spent before the PO is placed — in fabric choices, test protocols and spec decisions. The trap is assuming a longer, more demanding spec always produces a better garment. It often produces a more expensive one with the same failure rate, because the money went into a number on paper rather than the process that controls shrinkage, pilling and dye lots.
2 · How a Sportswear Manufacturer Reads Your Tech Pack
Four things written into a tech pack keep a knit stable: fabric type, GSM, nap direction and shrinkage tolerance. Some numbers are worth interrogating: a claimed GSM should be backed by a weight test report (ASTM D3776 or cut-and-weigh), because a number with no method behind it is not a specification.
3 · Where a Factory Can Cut Cost Without Cutting Quality
The savings are in consistency, not corner-cutting. Preshrinking is a process cost charged per metre of fabric — small per garment, but it prevents rework that costs far more. Locking one dye lot across a run avoids the classic failure: one batch shrinks within tolerance, the next shrinks 5% and a washed medium drifts toward a small.

4 · GSM, Wash and Fit: What a Supplier Will Push Back On
We will question a spec that cannot be measured or held. A shrinkage figure with no tolerance band, a "premium feel" with no fibre grade, a nap direction left unspecified — these cause two bulk lots to feel like two different fabrics. We would rather rewrite them into measurable terms than agree and deliver something inconsistent.
5 · FOB Shenzhen Pricing Logic for Custom Wholesale Orders
Our terms are deliberately plain: MOQ 300 pieces per style per colour (trials from 100), first samples in 7–10 working days, bulk in about 25–35 days, shipped FOB Shenzhen with T/T 50% deposit and 50% before shipment. When a quote is lower, the difference is almost always in what was left out of the fabric spec or the QC plan — not a smarter factory.




















